A quick trip to the condo this weekend with Jacob after picking him up from Lutherock camp, some progress was made to prepare for tiling and flooring.  I completed the luan in prep for the hardwood flooring, inspected the sheetrock and backer board in the master bath and verified dimensions for the tiling that will be started this coming weekend.  Also the carpet folks double checked the installation dimensions as I questioned this and sure enough they overestimated by 20%! 

The pic is the Master Bath drywalled with the new glass block to help bring in some needed natural light from the Bedroom windows. 

So carpet is ordered, sliding doors ordered, ordered tile and will be ready to start the tiling in the master and kitchen backsplace this weekend.